Installation of Air Conditioner

Installation of Air Conditioner Includes:

  1. Connection of the Indoor and Outdoor Units with Copper Pipes suitable for refrigerants with 9mm foam insulation (up to 2m refrigerant circuit).
  2. Installation of Drainage Φ16 or Φ18 according to specifications suitable for outdoor placement (up to 2m).
  3. Electrical connection of the air conditioner (up to 4m, electrical supply from the panel not included, if required).
  4. Installation of a support base for outdoor units suitable for each wall or floor-mounted machine. The metal bases are painted with electrostatic paint for greater durability over time.
  5. Creation of pipe vacuum and leakage testing.
  6. Sealing of drilled holes with waterproof building material to prevent moisture.
  7. Operation check and demonstration of the remote control.

The above works do not include:

  • Dismantling existing air conditioning units.
  • Installation of pipes in plastic channels.
  • Drilling in reinforced concrete.