Installation of Air Conditioner
Installation of Air Conditioner Includes:
- Connection of the Indoor and Outdoor Units with Copper Pipes suitable for refrigerants with 9mm foam insulation (up to 2m refrigerant circuit).
- Installation of Drainage Φ16 or Φ18 according to specifications suitable for outdoor placement (up to 2m).
- Electrical connection of the air conditioner (up to 4m, electrical supply from the panel not included, if required).
- Installation of a support base for outdoor units suitable for each wall or floor-mounted machine. The metal bases are painted with electrostatic paint for greater durability over time.
- Creation of pipe vacuum and leakage testing.
- Sealing of drilled holes with waterproof building material to prevent moisture.
- Operation check and demonstration of the remote control.
The above works do not include:
- Dismantling existing air conditioning units.
- Installation of pipes in plastic channels.
- Drilling in reinforced concrete.